9. Production
a) How is
product numbered?
b) Describe
packaging (unitized, pulp wrapper, plastic wrap, etc.).
c) Do mill
quality problems impact production scheduling/order lineup?
d) Is production
internally tracked in metric or imperial weights?
Metric
Imperial
e) Is shipping
tracked in metric, Imperial, or both?
Metric
Imperial
f) Please
describe reprocess tracking requirements.
10. Warehouse
a) What
is the on-site warehouse capacity?
b) Is barcode
tracking/scanning used on site?
Yes
No
If yes, how does it fit into the production and shipping flow?
c) Are RF
terminals used on-site?
Yes
No
If yes, which manufacturing system?
d) Please
describe off-site warehousing arrangements.
11. Grades
a) What
grades are produced by the mill?
b) What
distinguishes grade specifications from one another?
c) How are
grades determined?
12. Test
Procedures and Environment
a) How often
is testing done?
b) What
tests are performed?
c) How is
product tested?
All of the product in a production lot share the same set of
test results
The lot tests are based on several sets of tests
Other (please explain)
d) Would
automatic input from test equipment to the tracking system be
useful?
Yes
No
If yes, describe equipment to be interfaced.
e) How is
saleable product quantity determined (moisture, weight, length,
etc.)?
f) What
real-time interfaces are necessary for other systems (e.g. PI,
IP21, MOPS)?
g) How are
test results recorded?
13. Shipping
a) What
shipping methods are used?
Rail
Truck
Ship
Barge
b) Are shipments
containerized?
Always
Sometimes
Never
c) How many
shipments are sent per day on average?
d) What
is the percentage of domestic vs. import?
e) Are shipments
hot loaded?
Yes
No
f) Who plans
and orders vehicles?
g) Are railcars
switched in by Mill personnel?
Yes
No
Not Applicable
Does this require reporting?
Yes
No
h) Is shipping
documentation printed on-site?
Yes
No
If not, at what time?
i) What
paperwork is required (e.g. B of L, Quality Certificate, etc.)?
For the shipping company?
Yes
No
For the customer?
Yes
No
j) What
checks should be made when loading vehicles?
Order overloaded
Vehicle overloaded
Route weight limits (eg. bridge allowances)
Quality tests vs. order specifications
Other
14. Order
management, production planning and shipping process
a) Where
do orders originate?
b) Is product
ever shipped without customer orders (eg. to consignment warehouses)?
Yes
No
c) Does
the mill create orders (e.g. consignment orders to docks)?
Yes
No
d) Is production
planning based on outstanding orders/mill capacity/raw material
supply?
e) How many
customers are typically served per month?
f) How is
shipment method to a customer determined?
Always the same
Order by order basis
15. Reports
What are
the key reports that users require in each of these categories?
Production
Orders
Shipping
Quality
16. Please
advise if the product tracking system should preferentially
fit into a pre-existing computer infra-structure (hardware,
network, database).
17. Please
describe the mill network and workstations.
18. What
other systems exist that might be linked to the product tracking
system (existing sales management system, accounting systems,
etc.)?
19. I'd
like to schedule a web-based demo of solutions to typical tracking
problems
Yes
No
